# MRRTF Status
##
### Laurent Aphecetche
#### 23 Jan 2019
## Next Steps
### (Sep, 26th 2018)
- MID workflow on FLP
- Basic MCH clustering workflow
- MCH digitization
- MID geometry in simulation
---
## Janv 2019 status
### Postponed
- MID workflow on FLP
- some missing bit and pieces to be finalized
- Basic MCH clustering workflow
- priority shifted to (re)assessing the clustering situation
### Done
- MCH digitization : first basic version merged
- MID geometry in simulation : done
---
## Simulation
<div id="simulation-d3"></div>
<!-- .slide: data-state="d3" -->
- Progress shows _current_ O2 repo situation
- MID situation is actually _much_ better (both hit creation and digitization
are not far from pull requests)
---
## Reconstruction
<div id="reconstruction-d3"></div>
<!-- .slide: data-state="d3" -->
- Not much in O2 repo for MCH reco
- But things are moving on dev (private) repos
---
## MCH clustering
- Still in heavy R&D phase
- Extracted reference data set (of Run2 clusters) from one PbPb run of 2015
- Some tooling prepared (e.g. to visualize the clusters)
- Some investigation on the speedup of Mathieson integral computation
- Establishing "unit" tests along the way (e.g. ~closure tests : generate charge distribution and fit them, check we get back original ones, or quantify residuals if any)
---
## Some links
- Playground repos for clustering : [galo](https://github.com/aphecetche/galo) (and [pigiron](https://github.com/aphecetche/pigiron))
- Clustering status given at [WP12/13 meeting end of november](https://indico.cern.ch/event/773211/) (slide >=10)
- [Ongoing MID work](https://github.com/dstocco/AliceO2/tree/midSimulation)
---
## Next Steps
### (Jan 23rd 2019)
- MID sim in O2 repo (short term, i.e. couple of weeks)
- MCH tracking (medium term ?)
- MCH clustering (long term, i.e. months probably)
- MCH QC ?
- More detailed reports in April in Cape Town !
---
## Manpower
Hopefully better situation in 2019
- Michael entering the game
- Philippe and Diego should have more time to work on Run3 software
- Andrea contributing to MCH QC (until summer)
---
## O2 (bad?) news
O2 project being split in 3
- O2/FLP
- O2/EPN
- O2/PDP
More details end of this month.